top of page
950 Tower Lane - Metro Tower
Foster City, CA
[Gensler 2016]

Type: Lobby Repositioning
Date Of Completion:
Building Scope Size: 5700 SF
Project Duration: 8 months
Roles: Technical Designer, Project Architect
Tasks: Design Development, Planning Package, Renderings, BIM modeling
Description: Metro Tower had a completely open building lobby. The owner wanted to enclose the lobby which previously served as a circulation path through the building and into a courtyard. This was a particularly challenging project as there were structural, fire code, and budgetary restrictions. We enclosed both facades with IGUs and tube steel support structure. This was suspended from the beam above.





bottom of page